Underperforming Architects: The New Age of Architects

Communication New Industry

Managing an underperforming architect in the construction industry, especially one who provides sub-par drawings, applies ineffective communication, and submits inconsistent details and specifications, can be challenging. However, there are several strategies you can implement to address these issues and ensure the project remains on track. Here’s how you might approach it:

1. Establish Clear Communication Channels

  • Regular Meetings: Schedule frequent and structured coordination meetings with the architect, contractors, and other stakeholders. In these meetings, review drawings and details carefully, raise concerns about inconsistencies, and insist on resolutions within agreed-upon timelines.
    • Why This Matters: Regular meetings are crucial for ensuring that the architect stays engaged and accountable. By bringing the architect together with contractors and stakeholders, you create an environment where issues can be identified early and addressed before they escalate. It also helps to prevent miscommunication, a common problem when multiple parties are working from inconsistent or unclear drawings.
    • Execution: Schedule structured coordination meetings, such as weekly design coordination meetings, where you and the architect review the drawings and discuss any inconsistencies, errors, or omissions. These meetings should have a clear agenda focused on problem-solving, including reviewing specific areas of concern, action items from the previous meeting, and the status of resolutions. The goal here is to foster collaboration while holding the architect accountable to deliver accurate and consistent work within agreed-upon timelines.
  • Document Communication: Ensure all communication is well-documented through emails or a project management tool. This creates accountability and ensures there’s a record of what was discussed, agreed upon, and required changes.
    • Why This Matters: Inconsistent communication can lead to disputes, blame-shifting, and confusion down the line, especially when errors become visible only during construction. Proper documentation not only helps to clarify expectations and track progress but also serves as a safeguard in case of disputes or litigation.
    • Execution: Use formalized communication tools like email threads, project management software (such as Procore, PlanGrid, or BIM 360), and cloud-based file-sharing platforms to ensure all project-related discussions, decisions, and approvals are documented. Each issue, clarification, and solution should be logged to create a record of what was discussed, agreed upon, and who is responsible for next steps. This way, you can trace back communication if issues arise and hold the architect accountable for addressing concerns. In the event of legal disputes or contract enforcement, documented communication becomes invaluable evidence.
  • Use RFIs (Requests for Information): When you encounter issues or ambiguities in the drawings or specifications, formalize them through RFIs. This will prompt the architect to address each issue officially, in writing.
    • Why This Matters: RFIs (Requests for Information) formalize the communication process, especially when clarity is needed on the architect’s drawings, details, or specifications. An RFI helps pinpoint the exact issue, and when responded to, it becomes part of the project’s legal and contractual documentation.
    • Execution: When issues arise regarding missing details, unclear specifications, or conflicting instructions, submit an RFI to the architect. Each RFI should be specific, detailing the exact section of the plans or specifications in question, and requesting clarification or correction. This process ensures that any ambiguities are addressed in a timely, formal manner and gives the architect an opportunity to provide a written resolution. A comprehensive RFI process can also serve as a project audit trail, making it clear when and where any breakdowns in communication or design occurred.

2. Hold to Contractual Obligations

  • Review Contract Scope: Revisit the architect’s contract to ensure that they are meeting their deliverables as outlined. If there are specific performance standards or deliverable requirements, use those to hold the architect accountable.
  • Issue Non-Conformance Notices: If the architect continues to provide sub-par work, you can issue non-conformance notices as per the contract. This puts the architect on formal notice that their work is not meeting required standards, creating a legal basis for future actions if performance doesn’t improve.

3. Engage in Design Review Processes

  • Peer Review: In complex projects, you may consider engaging a third-party peer review, especially for critical design elements. This helps catch inconsistencies and provides an expert opinion on design quality.
    • Why This Matters: On complex projects, especially those with critical or high-risk design elements, it can be beneficial to have a third-party peer review the architect’s work. Peer reviews provide an external expert perspective, often catching errors or inconsistencies that may have been overlooked by the architect or internal team. A peer review can also provide assurance to all stakeholders that the design adheres to industry standards and best practices.
    • Execution: Engage a third-party professional—such as another architect or engineer who specializes in the relevant field—to conduct a detailed review of the project’s design elements. This review focuses on identifying design flaws, checking for code compliance, evaluating constructability, and ensuring that key design decisions make sense from both an aesthetic and functional perspective. Peer reviews are especially useful for high-stakes components, such as structural elements, mechanical systems, or unique architectural features that could have significant consequences if poorly designed.
  • Internal Quality Control: Establish an internal design review process within your team, or involve a more experienced engineer or architect to scrutinize the design early on. This can catch errors or omissions before they affect the construction phase.
    • Why This Matters: Relying solely on the architect for design quality can be risky, especially when they have a track record of providing sub-par work. By establishing an internal quality control process within your team, you can catch errors, inconsistencies, or omissions before they turn into construction delays or cost overruns.
    • Execution: Develop a formal internal review process, where senior engineers, architects, or project managers scrutinize the design documents before they are released for construction. This can be done through scheduled design reviews at different stages of the project—such as during the schematic design phase, design development, and just before the construction documents are finalized.
  • Clash Detection Tools: Use Building Information Modeling (BIM) or clash detection software to identify inconsistencies in the drawings. This can force the architect to address the issues in a measurable, digital format.
    • Why This Matters: Design conflicts, such as a beam running through a duct or an improperly sized mechanical system, are common issues that can halt construction if not detected early. Inconsistent or conflicting designs are often a symptom of poor coordination between the architect and other consultants (e.g., structural, mechanical, or electrical engineers). Using Building Information Modeling (BIM) and clash detection software allows you to identify these issues digitally, before they become costly on-site problems.
    • Execution: Implement BIM tools like Navisworks, Revit, or Autodesk BIM 360 to visualize and analyze the project’s design. BIM enables real-time collaboration and integration between different disciplines (architecture, structural engineering, MEP systems), allowing you to detect “clashes” between different building components.
  • Putting It All Together
  • Incorporating peer reviews, internal quality control, and clash detection into your project management strategy allows you to manage an underperforming architect more effectively. These processes ensure that design errors and inconsistencies are caught and corrected early, saving time, money, and frustration during the construction phase.
  • By being proactive in the design review process, you protect the integrity of the project and reduce the risk of delays, cost overruns, or disputes. Not only does this approach mitigate the effects of poor architectural performance, but it also fosters a culture of accountability and collaboration, ultimately ensuring the success of the project.

4. Be Proactive on Design Quality

  • Check Details Early: Instead of waiting for major issues to occur during construction, review the architect’s drawings at key stages. Bring up any concerns, errors, or inconsistencies early so that corrective action can be taken before the project progresses too far.
    • Why This Matters: A common issue with underperforming architects is that errors or inconsistencies in their drawings only come to light once construction is underway, leading to costly delays, change orders, or even rework. By reviewing their designs at key stages in the project, you can catch these issues before they have a chance to derail construction. Early identification of problems allows for corrective action when it is cheaper and less disruptive to the project’s schedule.
    • Execution: Set up checkpoints in the project timeline where the architect’s drawings and specifications are reviewed in detail. These checkpoints should align with key phases in the design process, such as:
      • Schematic Design: At this stage, ensure the overall layout and design concepts align with the project’s goals and that there are no major inconsistencies in the high-level plans.
      • Design Development: Scrutinize the finer details, such as dimensions, materials, and systems coordination, to ensure they match the project’s scope and real-world construction requirements.
      • Construction Documents: Before final drawings are issued for construction, thoroughly review the detailed drawings for any errors, missing information, or clashes between architectural, structural, and mechanical designs.
  • Provide Feedback: Actively provide feedback to the architect when issues arise. Ensure that they understand the real-world implications of poor details or specifications, such as delays or increased costs.
    • Why This Matters: One of the major contributors to poor architectural performance is a lack of feedback. Underperforming architects may not fully understand the real-world consequences of their errors or inconsistent drawings. By providing detailed, constructive feedback when issues arise, you can help the architect understand how their design decisions impact the broader project. This not only pushes the architect to improve the quality of their work but also builds a more collaborative working relationship.
    • Execution: As you review the architect’s work, make it a priority to provide clear and actionable feedback. When you encounter an issue, such as missing details or conflicting specifications, don’t just point out the problem—explain the potential impact it could have on the construction process. For example:
      • Delays: If a design error requires clarification during construction, it could result in a standstill on-site while waiting for updated drawings. Make sure the architect understands that their mistakes could delay the schedule, affect subcontractors, and disrupt the project’s overall flow.
      • Cost Overruns: Poor details or incorrect specifications may require rework or change orders, which add unanticipated costs. Emphasize how these added expenses affect not only the client’s budget but also the project’s profitability.
      • Quality Concerns: Inconsistent details can lead to poor workmanship or suboptimal finishes. For instance, an architect might specify a material that is difficult to install or not readily available, which can result in lower-quality construction or rushed work to meet deadlines.
  • Build a Feedback Loop
    • Why This Matters: Establishing a feedback loop ensures that issues identified in one phase of the project don’t repeat in later phases. It also creates a system of continuous improvement where the architect is encouraged to address and learn from mistakes. This is especially important when working with underperforming architects, as consistent feedback helps raise the standard of their work over time.
    • Execution: Use regular design review meetings or project status updates to create a structured feedback loop. After each review, summarize the issues discussed and provide a written record of the feedback, including specific action points for the architect. This ensures they are aware of the necessary corrections and can track their progress.
      • Consider creating a design review log, where you document recurring issues or areas that require improvement. This log should highlight critical concerns, track when they were raised, and monitor when they were resolved. By keeping a log, you can see if the architect is consistently improving or if the same issues keep reappearing, which may indicate the need for further interventions.
      • Finally, hold follow-up meetings to review how well the architect addressed the feedback provided. This keeps the architect accountable and encourages them to act on the feedback promptly. In some cases, if the architect continually underperforms despite feedback, you may need to escalate the issue or involve the client to determine if more significant action is needed.

5. Request Revisions & Clarifications

  • Demand Corrections: If you encounter copy-paste errors, incorrect details, or irrelevant specifications, insist that the architect corrects these mistakes. Provide detailed feedback to minimize ambiguity, and don’t hesitate to ask for revisions that align with the project’s specific needs.
  • Ask for Simplified Drawings: Often, inconsistent or overly complicated details stem from reusing generic information. Ask the architect to simplify the details and provide more tailored, clear drawings that match the specific project scope.

6. Escalation & Replacement

  • Escalate to Management: If the architect works within a larger firm, consider escalating the matter to their management or principal architect. Express concerns about the quality and ask for higher-level involvement to correct the issues.
  • Consider Replacement: If performance doesn’t improve, you may have to replace the architect. This could involve bringing in another design professional to finish or correct the work, though this can be costly and time-consuming. Be sure that your contract includes provisions for such a scenario.

7. Training and Mentorship

  • Provide Opportunities for Improvement: In some cases, an architect might be underperforming due to lack of experience or support. Offering training sessions, mentorship, or pairing the architect with a more experienced team member could potentially improve their performance.
  • Collaborative Work Sessions: Organize sessions where the architect, contractors, and engineers work together on problem areas. This might allow the architect to understand real-world constraints and improve their design inputs moving forward.

8. Managing the Construction Impact

  • On-Site Adjustments: Sometimes, construction teams have to make adjustments in the field to compensate for incomplete or erroneous drawings. Ensure there’s flexibility in the field team and that any changes are approved in writing to avoid disputes later.
  • Contingency Planning: Plan for potential delays or cost overruns that might result from poor design documents. Factor in these risks in your project timeline and budget, and make sure to document the additional costs arising from design-related issues, which could potentially be claimed later.

9. Final Option: Legal Recourse

  • Enforce Penalties: If the architect’s performance continues to deteriorate, and contractual non-conformance continues, consider applying financial penalties, as per the contract.
  • Legal Action: In worst-case scenarios, consider legal action if the architect’s work causes significant delays, cost overruns, or quality issues. However, this is typically a last resort, and often a clear, proactive approach is more effective.

To Sum it all up, managing an underperforming architect in the construction industry poses significant challenges, especially when they provide sub-par drawings, ineffective communication, and inconsistent details. This research explores several strategies to address these issues and maintain project integrity. Key methods include establishing clear communication channels through regular meetings, documented communication, and Requests for Information (RFIs) to ensure accountability. Contractual obligations should be enforced, with non-conformance notices issued if performance fails to meet standards. Design quality control is critical, involving third-party peer reviews, internal checks, and clash detection tools like Building Information Modeling (BIM) to identify and correct design inconsistencies. Proactive engagement, such as early review of drawings and consistent feedback, helps prevent major issues during construction. Additionally, corrective measures like demanding revisions, escalating issues within the architect’s firm, or ultimately replacing the architect, are discussed. Training and mentorship can also improve performance, while contingency planning mitigates construction delays or cost overruns caused by poor designs. Finally, legal recourse, including financial penalties, is explored as a last resort. These strategies collectively ensure effective management of architectural underperformance, aiming to keep construction projects on track despite design challenges.